Previous Action Items:
Paul to flesh out documentation on the bounty board - Pushed up a PR on 8/2/21
Iced to complete the program proposal for funding - IN progress
Individual Updates
  • Behold
    • Behold coded all weekend! He is VERY plugged in.
    • Update the validation schema on github - sometimes won't throw explicit errors
      • Schema in the MVP will need everything in it.
    • Update API route, so when a bounty is past DRAFT can't change or get rid of it.
    • Merged with Oktals branch.
  • Brian
    • Worked on emoji reactions for direct messages and messages in the channel
    • Will be published as a style embeded and color coded to #bounty channel!
  • Bpetes
    • No major updates ready to help with test - set him loose on em!
  • John
    • No major updates - refactored some tests.
    • Checkin on status - Iced and John to get up.
  • Oktal
    • Work merged in from Behold!
    • Working on dating the front end components.
    • Just finished getting the single bounty page refactored - It is pretty!
    • Next up is working on the forms to chakra them up.
    • Chipping away at getting front end set up.
  • Nonsense
    • Discussing with Brian, most functionality is built into degen.
    • Since functionality is built can we mark this for completion?
    • It has been marked as complete as current MVP is technically complete.
  • Paul
    • Validation schema has been added locally which he will add to the final MVP
    • Testing the bot in the garage - Serendipity
    • Planning to touch base on Brian to get some of the commands to work.
    • Fleshing out the queries on post MVP
  • Iced
    • Writing up future MVP features
    • Fleshing out funding
    • Fleshing out future relationships and integrations
    • GRANTS!
Alignment on Current Project Status
    Prioritization of next steps and hand raise:
      Parking Lot
      • MVP - IS THIS WEEK THE WEEK! -
        • What is not complete:
          • Technically everything on the front is WORKABLE
            • FORM IS INCOMPLETE
              • It isn't chakra - it needs to ride down refactor lane.
            • Filters - not complete.
            • Pick one, not two.
          • We can only launch it once - lets it do it right.
            • Nonsense
            • Brian
            • Paul
            • Bpetes
            • Iced
          • We should cut and go live
            • Behold
            • Oktal
          • Oktal to get the form complete by Thursday
          • We have several pull requests open in github to be reviewed and merged to develop.
            • Need to get it to build on netlify
            • Get it merged in now while oktal works on forms, because it is functional.
          • Testing schedule -
            • Start testing FRIDAY!
              • As filters are added incorporate those filters.
      • Compensation
        • Past work
          • Just a coordinape
          • Static amount, then coordinape the rest?
        • Multisig!
        • Future funding
          • Roles
            • Coordinator
            • Front end dev
            • Mixed dev
            • Back end dev
            • Smart contract dev
            • Design
            • Analytic
        • Post MVP
          • After this MVP
            • Translation
          • Bug fix analysis
      Potential blockers?
        Action items
        Bounty Board - Stand Up - 8/3/21
        📋

        Bounty Board - Stand Up - 8/3/21

        Last edited by
        Date
        Aug 3, 2021
        Last Edited Time
        Feb 4, 2022
        Previous Action Items:
        Paul to flesh out documentation on the bounty board - Pushed up a PR on 8/2/21
        Iced to complete the program proposal for funding - IN progress
        Individual Updates
        • Behold
          • Behold coded all weekend! He is VERY plugged in.
          • Update the validation schema on github - sometimes won't throw explicit errors
            • Schema in the MVP will need everything in it.
          • Update API route, so when a bounty is past DRAFT can't change or get rid of it.
          • Merged with Oktals branch.
        • Brian
          • Worked on emoji reactions for direct messages and messages in the channel
          • Will be published as a style embeded and color coded to #bounty channel!
        • Bpetes
          • No major updates ready to help with test - set him loose on em!
        • John
          • No major updates - refactored some tests.
          • Checkin on status - Iced and John to get up.
        • Oktal
          • Work merged in from Behold!
          • Working on dating the front end components.
          • Just finished getting the single bounty page refactored - It is pretty!
          • Next up is working on the forms to chakra them up.
          • Chipping away at getting front end set up.
        • Nonsense
          • Discussing with Brian, most functionality is built into degen.
          • Since functionality is built can we mark this for completion?
          • It has been marked as complete as current MVP is technically complete.
        • Paul
          • Validation schema has been added locally which he will add to the final MVP
          • Testing the bot in the garage - Serendipity
          • Planning to touch base on Brian to get some of the commands to work.
          • Fleshing out the queries on post MVP
        • Iced
          • Writing up future MVP features
          • Fleshing out funding
          • Fleshing out future relationships and integrations
          • GRANTS!
        Alignment on Current Project Status
          Prioritization of next steps and hand raise:
            Parking Lot
            • MVP - IS THIS WEEK THE WEEK! -
              • What is not complete:
                • Technically everything on the front is WORKABLE
                  • FORM IS INCOMPLETE
                    • It isn't chakra - it needs to ride down refactor lane.
                  • Filters - not complete.
                  • Pick one, not two.
                • We can only launch it once - lets it do it right.
                  • Nonsense
                  • Brian
                  • Paul
                  • Bpetes
                  • Iced
                • We should cut and go live
                  • Behold
                  • Oktal
                • Oktal to get the form complete by Thursday
                • We have several pull requests open in github to be reviewed and merged to develop.
                  • Need to get it to build on netlify
                  • Get it merged in now while oktal works on forms, because it is functional.
                • Testing schedule -
                  • Start testing FRIDAY!
                    • As filters are added incorporate those filters.
            • Compensation
              • Past work
                • Just a coordinape
                • Static amount, then coordinape the rest?
              • Multisig!
              • Future funding
                • Roles
                  • Coordinator
                  • Front end dev
                  • Mixed dev
                  • Back end dev
                  • Smart contract dev
                  • Design
                  • Analytic
              • Post MVP
                • After this MVP
                  • Translation
                • Bug fix analysis
            Potential blockers?
              Action items